Thesis

Optimisation of large-scale offshore wind farms considering turbine layout, cable layout, and co-located energy storage systems

Creator
Rights statement
Awarding institution
  • University of Strathclyde
Date of award
  • 2025
Thesis identifier
  • T17189
Person Identifier (Local)
  • 201777062
Qualification Level
Qualification Name
Department, School or Faculty
Abstract
  • This thesis aims to explore two ways in which the electrical infrastructure of a gigawattscale offshore wind farm may be optimised to reduce costs and aid the increasing deployment of renewable energy capacity. The two areas considered are (1) the integration ofa cable layout optimisation with a turbine layout optimisation forming a novel concurrent optimisation framework, and (2) the integration of energy storage systems into acable layout optimisation for the purpose of peak-shaving power in the cables enablingalternative cable sizes to be used and reducing peak electrical losses.While there are a wide variety of approaches to turbine layout optimisation, theparticle swarm optimisation (PSO) method offers a good balance between accuracy andcomputational expense, enabling large-scale problems to be handled by standard desktop PCs. The turbine layout problem is formulated as a grid-based layout, fully definedby eight variables, to comply with maritime navigation and search and rescue regulations, while allowing some deviation to maximise energy capture. The eight variablesdefining the grid are optimised by means of PSO, followed by a novel micro-siting function to move individual turbines and increase energy yield. The method was comparedto SSEs in-house method, matching the energy capture of a case study of their BerwickBank site to within 0.3%.Two cable layout optimisation methods from the literature are selected, which arethe widely used mixed-integer linear programming (MILP) method, and ant colony optimisation (ACO) representing the increasing use of heuristic approaches. These arecompared to a novel ACO-based method, ACOsp, that employs a decomposition strategy. The ACOsp method is shown to maintain the good quality solutions of the MILPapproach, with solutions 0.0-1.4% more expensive than optimal, while also demonstratiiing the computational efficiency of heuristic approaches, useful for large-scale problems.An optimisation framework considering the concurrent optimisation of turbine andcable layouts is proposed, with comparison made to a sequentially optimised solutions,isolating the impact of this integration. Solutions of the integrated, concurrent, approach show improved objective values where the increase is statistically significant.For a case study site with 164-165 turbines, the approach increases the objective value(for this maximisation problem) by 0.45%, which is slightly less than the increase foundby the addition of one further turbine at 0.55-0.57%.Considering the limitations of the investigated cable layout optimisation approaches,a following study proposed a MILP-based optimisation in combination with a decomposition strategy, MILPsp. The MILPsp method maintained the accuracy of the MILPmethod and reduced computational expense, improving on the earlier ACOsp method.Variables describing ESS are integrated into the MILPsp algorithm to determine theimpact of using co-located ESS on the array cable network. It was found that very fewcharging strategies were able to deliver meaningful peak shaving to the power in the array cables and those that did required a very large ESS capacity to do so (3MW/64MWhfor a site using 8MW turbines). Further, the required cost of the co-located ESS wasprohibitively low, at <£1,800, compared to real ESS prices at the time of writing.Ignoring cost restrictions, using ESS within the cable layout optimisation, for a sitecontaining 122 8MW turbines, was able to reduce cable network costs by 0.22-1.85%.
Advisor / supervisor
  • Jia, Chunjiang
  • Yue, Hong
  • Anaya-Lara, Olimpo
  • Campos-Gaona, David
Resource Type
DOI
Date Created
  • 2024
Funder

Relations

Items